伊园甸庥园2024直达入口_禁止十八勿入的3000芒果_免费无套30分钟

OUR BUSINESS

01

Hydropower generation business

CYPC has a total installed capacity of 71,795 MW, including 71,695 MW of domestic installed capacity, accounting for 12.3% of China's total hydropower installed capacity. It generates 185.58 Twh of electricity in 2022. CYPC currently owns six giant hydropower stations, namely the Three Gorges, Gezhouba, Xiluodu, Xiangjiaba, Wudongde and Baihetan.

02

Smart Integrated Energy Business

To become a leading enterprise and a pacesetter in the integrated smart energy segment, Three Gorges Electric Energy Co., Ltd. (TGEE) under CYPC is actively promoting the expansion of the integrated smart energy market, and innovating the urban green integrated energy housekeeping development model with characteristics of Three Gorges by its rich practice in "one energy storage, two networks, three load sources and four energy sources".

03

New Energy Business

In 2021, China Yangtze Power New Energy Co., Ltd was established to implement CYPC's new energy business development strategy and promote the goals of investment, construction and operation of new energy projects. The company's core business is mainly engaged in the "water-wind-electricity integration" of renewable energy base located in the lower reaches of the Jinsha River in Yunnan Province and both sides of Sichuan Province...

04

Power Distribution and Sales Business

In April 2020, CYPC completed the acquisition of the Peru's largest electricity distribution company, LDS. It represents a new starting point for CYPC to open up its overseas distribution assets and puts it on track to become a future global energy giant with integrated capabilities of power generation, distribution and sales. In May 2020, CYPC completed the overall listing of three local idle distribution networks in Wanzhou, Fuling and Qianjiang...

05

Investment and Financing Business

CYPC has six large hydropower stations (Three Gorges, Gezhouba, Xiluodu, Xiangjiaba, Wudongde, and Baihetan) along the mainstream of the Yangtze River, with the total installed capacity of 71.695 GW. Through"coordinated dispatching of six reservoirs -Three Gorges, Gezhouba, Xiluodu, Xiangjiaba, Wudongde, and Baihetan," the company has given full play to the cascade hydropower stations, which improved the utilization...

SUSTAINABLE DEVELOPMENT

The company combines its own developuent witsocial sustainable development,constagtlypromotes community development and.piogress as well asactively takes part in sociat welfareundertakings and pays back society with responsibilities,wisdom and sincerity.

(+86)0717-6767608Technical support provided by the Digital management center, CYPC China Yangtze Power Co.,LtdJing ICP Bei No.05051793-1

慈利县| 景德镇市| 舒城县| 阿图什市| 布拖县| 辛集市| 阿城市| 富锦市| 垦利县| 二连浩特市|