伊园甸庥园2024直达入口_禁止十八勿入的3000芒果_免费无套30分钟

CN

About Us

< About Us
Development History
July 21

All 82 units of the four hydropower stations (Xiluodu, Xiangjiaba, Three Gorges and Gezhouba Hydropower Stations) were put into operation, with the maximum output power reaching 43,066 MW, accumulative daily generating output breaking 1 kWh for the first time, reaching 1.01226 kWh.

August 4

The 2013 annual information disclosure work of CYPC was evaluated as “Class A” by Shanghai Stock Exchange.

August 25

CYPC International formally signed two single contracts (Contract for Establishment of Management System of Murum Hydropower Station and Contract for Operation and Maintenance Technology Consultation for Murum Hydropower Station) with Sarawak Energy Berhad (SEB) of Malaysia, realizing the output of the core ability for operation of large hydropower stations to overseas countries for the first time.

December 10

China Yangtze Power International (Hong Kong) Co., Ltd. (CYPI) successfully participated in the Initial Public Offering (IPO) of H shares of CGN Power Co., Ltd. on HKEX, obtaining 278,959,000 H shares of CGN Power, accounting for about 0.63% of the issued shares of the latter.

December 31

Three Gorges Hydropower Station had cumulatively generated 98.819 kWh of power, breaking the world record for the highest annual power generation from a single hydropower station.

张家川| 新干县| 临清市| 栾城县| 凌源市| 清新县| 德昌县| 通许县| 拜城县| 班玛县|